Nightingale Best Of Competition Winner Addresses Fast-Track Care In EDs
DIRTT’s prefabricated exam unit aims to address throughput and overcrowding in emergency departments with an all-in-one solution for fast-track care.
Modular Construction: Building the Future of Higher Education Spaces
As student expectations shift and teaching models evolve, campuses must become more agile and responsive. Learning environments now need to support collaboration, technology integration, and change at scale.
70/30 Flipping The Construction Cost Equation with Benjamin Urban
Off-site construction meets real-time adaptability as DIRTT brings Design for Disassembly and software-driven building to the forefront of healthcare, education and workplace design.