Capilano University Centre for Student Success

An efficient path to student success

  • Location

    North Vancouver, British Columbia

  • SQ FT

    13,000

  • DIRTT INSTALL

    6 Weeks

  • Architect

    HDR

  • General Contractor

    Index Construction

Image Credit: Upper Left Photography

As Capilano University was creating a new Centre for Student Success, they wanted to consolidate services from across the campus. Bringing everything together under one roof offered an efficient experience for new and returning students alike. Efficiency was also key when it came to constructing the space. With a five-month window to complete the renovations, Capilano University needed a way to build that fit their schedule.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

Capilano University's architect, HDR, had worked with DIRTT before and knew how responsive and collaborative we could be. Using a technology-driven manufacturing process meant that DIRTT could deliver on schedule without any budget fluctuation. And precision wasn’t just limited to timelines and cost. Fit and finish were a key component to the Center for Student Success. An early look at the designs revealed a free-standing feature wall with a technology display. DIRTT Timber offered a custom solution that was more cost effective than the casework they had planned. A custom approach also accommodated structural beams that run floor to ceiling through student huddle rooms. Leveraging precision and efficiency to support their sustainability goals, Capilano University got a space that streamlines both the student experience and the construction process.

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.