CAST Tech High School
Breathing new life into an existing campus building
Location
SQ FT
DIRTT Construction Partner
Architect
Designer
General Contractor
When the San Antonio Independent School District set out to breathe new life into an old campus building, flexibility was top of mind. CAST Tech High School works with industry partners to prepare students for careers in technology and business. To flourish, they wanted the space to accommodate a growing student population. If that weren’t enough, the school district was working with an ambitious construction schedule to get students back to learning before the start of the school year.
Product Spotlight
Project Includes:
DIRTT's rapid construction coupled with innate responsiveness made it possible. Creating a dozen classrooms, a handful of conference rooms, admin spaces, teachers lounges and support spaces is one thing. Being able to respond to pedagogy changes is another. With DIRTT’s modular approach they could integrate technology to meet the needs of today while still being able to adapt to changes that come tomorrow.
We needed CAST Tech High School to be adaptable over time.
Dr. Melissa Alcala
Principal, Cast Tech High School
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.