Solid Walls

Integrations

Additional Projects

Share this

Altru Performance Center

Enter the fun factory

  • Location

    Grand Forks, North Dakota

  • SQ FT

    40,000

  • DIRTT Construction Partner

    Smartt Interior Construction

  • Architect

    JLG Architects

  • General Contractor

    Construction Engineers

DIRTT interiors

Image Credit: Shawna Noel

With a 100-year history of high-quality healthcare in North Dakota, Altru Health Systems needed a new space that could live up to that reputation. Building a one-stop-shop for physical, occupational, hand, speech and pediatric therapy was the goal. Using the DIRTT Construction System helped them do it.

Product Spotlight

4” Solid Walls

4” Solid Walls

Modular Panel Wall System

Customize your walls and define your space.

Electrical

Electrical

Modular Electrical System

A powerful approach to connected infrastructure

Scroll horizontally to move
the image

Spotlight
Spotlight

Graphics

Applied Finishes Support Your Aesthetic

Tell the story of your space with custom graphic wall panels.

Project Includes:

    Leveraging comprehensive BIM models ensured that Altru could optimize accessibility and patient flow long before construction began. This confidence extended to aesthetics too. Using wall panels with integrated graphics supported their incorporation of distraction imagery. This ensures patients (especially kids) feel comfortable while working with their therapists. The pediatric space has a colorful design including a two-story play structure and zip lines. They even have climbing walls integrated into the DIRTT walls which is why it’s affectionately known as “the fun factory.”

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    Privacy Policy

    Intellectual Property

    Terms + Conditions

    Investor Presentations

    © DIRTT 2026