Additional Projects

Share this

Mosaic Community Health – Conners Health Center

Ready for today. Planning for the future.

  • Location

    Bend, Oregon

  • SQ FT

    13,297

  • DIRTT INSTALL

    28 days

  • DIRTT Construction Partner

    Eteriors

  • Architect

    GL3

  • Designer

    GL3

  • General Contractor

    R&H Construction

DIRTT interiors

Image Credit: Alan Brandt Photography

Known for providing care to low-income and uninsured patients, this health system built out a clinic with 36 new exam rooms and pharmacy. With plans to expand their service, they knew that our modular prefab construction would give them the power to adapt in the future. What they didn’t know was all the other benefits that come with DIRTT.

Product Spotlight

Scroll horizontally to move
the image

Spotlight

Project Includes:

    In previous locations, Mosaic had challenges optimizing acoustics for speech privacy. DIRTT’s Solid Wall assembly has a minimum sound transmission coefficient (STC) of 38. By adding an extra layer of insulation and some perimeter enhancements, the walls easily delivered the acoustics they were looking for. Finished with medium-density fiberboard (MDF) panels, those walls gave Mosaic the look they wanted while Thermofoil laminate and ChromacoatPlus paint offered increased durability.

    Those removeable wall panels are part of what makes the DIRTT system adaptable. They also make maintenance easy. When Mosaic was looking to the future, they planned to add solid blocking behind every wall to ensure they could mount whatever equipment needed. With DIRTT, it’s easy to remove a single panel and add blocking as needed, whether it’s next week or next year. Taking that blocking out of the scope took $15,000 out of the budget before they even moved in. With a DIRTT install that took four weeks and a punch list that only took four hours, the resulting health center gave Mosaic exactly what they were looking for.

    DIRTT
    DIRTT

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    © DIRTT 2026