Newsletter Sign Up

Primary ENT

Setting a standard for clinical construction

  • Location

    Savage, Minnesota

  • SQ FT

    3,240

  • DIRTT INSTALL

    10 days

  • DIRTT Construction Partner

    adaptt

  • Architect

    Synergy

  • Designer

    Synergy

  • General Contractor

    Timco Construction

Image Credit: Lindsay Nicole

There’s a massive need for low-acuity, high-urgency healthcare. Consider that capacity constraints mean patients often wait eight weeks to six months to see a medical specialist. Dr. John Boone did. Solving for that was what prompted him to build Primary ENT. Quickly creating clinics to provide same-day care for ear, nose, and throat treatment improves the level of patient care and reduces strain on the health system overall. To bring this retail-inspired clinic model to life, Dr. Boone turned to DIRTT.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

Our multi-trade, prefab, modular approach to construction helped Primary ENT create standardized healthcare spaces with a short construction schedule and a long life. Off-site manufacturing not only expedited the project timeline, it provides a way to easily replicate this clinic model in different markets. This offers a unified look, fit, and finish across locations, which is key to a consistent patient experience and efficient retail strategy. With modular electrical systems and a wall system that easily integrates technology, these modern spaces support quick easy upgrades, remote physician consults, and an in-house TV network with content geared directly to patients. While most new clinics need two to three years to reach capacity, Dr. Boone’s Primary ENT clinic reached capacity after being open for just one year.

The modularity of what you guys do is incredible. It really allows us to be nimble as we evaluate and build out new locations.

Pat Wilson

chief operating officer and co-founder, Primary ENT

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

Contact form

Ready to get started?

Connect with a DIRTT construction specialist to bring your next project to life.

© DIRTT 2024