  • Location
    Kansas City, Missouri
  • Year
    2019
  • Duration
    2
    months
  • Installation Duration
    5
    days
  • Sq Ft
    8000
  • DIRTT Partner
    built

No time to waste

In 2018, the team at Valencia Endodontic Associates were in a tight spot. They learned their lease wasn’t going to be renewed and had just three months to find a new home. By the time they found a space and got the architectural designs approved, they only had 60 days to get up and running. That would be a challenge for any construction project. When you factor in the added complexity of building a dental office, it seemed almost impossible. Almost.

Working with DIRTT provided the advantage needed to meet their aggressive schedule. Visualizing the space with our proprietary design platform ICE® assured them that they could get the clean, modern look they wanted. And because the information in ICE fed right to DIRTT factories, all the solutions were built in 21 days or less. Everything, from the DIRTT access floor to accommodate dental plumbing to the millwork in the kitchen arrived on-site ready to install. Within five days, it was all in place. In the end, the team at Valencia got the space they needed. And it was operational four days ahead of schedule.

Download PDF

There is no way this project would have been completed on time with traditional construction.

Dr. Chad Wollard, Valencia Endodontic Associates
  • Take A Tour

    Photo Credit: Bob Greenspan
    A speedy reopening
  • Photo Credit: Bob Greenspan
    Helping patients faster
  • Photo Credit: Bob Greenspan
    Millwork and a Corning® Willow® Glass backsplash
  • Photo Credit: Bob Greenspan
    DIRTT access floors for flexibility
  • A sliding door to save space
    Photo Credit: Bob Greenspan
14
Details

More under foot

The DIRTT Access Floor speeds up installation and manages cables. Long term, it keeps your infrastructure easily accessible for IT.

Details

Ultra thin and incredibly durable

Corning® Willow® Glass incorporates vibrant graphics into your space. Crystal clear glass makes them look great. It's impact resistant, plus you can write on or clean the surfaces.

Details

Design freedom and certainty

DIRTT Casework gives you complete design freedom without paying for the cost of custom. All on fast and certain DIRTT lead times.

Details

Efficient electrical

DIRTT’s quick-connect power makes for rapid on-site installation. All while it reduces waste and improves adaptability for any future changes. 

Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.

Get In Touch

Close