- LocationCalgary, Alberta
- Year2017
-
Duration6weeks
- Build typenew build
- Sq Ft1600
A taproom as good as the beer
As brewers, Annex Ale Project moves fast so they can follow their inspiration. Why would building their space be any different. They wanted custom casework behind the bar and a feature timber structure with their brewery’s logo at the center. The challenge? There was only six weeks till opening day. With DIRTT, the tight timeline was no problem. Building everything off-site meant that Annex Ale got the space they wanted right on time. Now, their taproom lets them focus on what’s important: great beer and great people.
DIRTT managed to produce and install the casework and timber frame like no one else could. Our taproom receives as much positive feedback as our beers do.
Andrew Bullied, co-owner and brewmaster, Annex Ale Project
Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.
Get In Touch