Newsletter Sign Up

Bell Bank

Beauty and flexibility to meet evolving needs

  • Location

    Fargo, North Dakota

  • DIRTT Construction Partner

    Smartt Interior Construction

  • Designer

    Facilities Department at Bell Bank

  • General Contractor

    Dakota Construction

Image Credit: Paul Flessland Photo LLC

Bell Bank was looking for a flexible solution for their evolving company needs. Something that was functional and welcoming. With DIRTT they got both.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

Custom veneer panels bring warmth to the space while Breathe® Walls bring a living pop of color. Switch glass walls can change from transparent to opaque for privacy with the flick of a switch. And then there’s the stuff you can’t see. DIRTT quick-connect power running through the walls supports embedded monitors and room-booking technology. All of it is manufactured off-site for quick and clean installation. That meant that when Bell Bank ran into delays during renovation, DIRTT modular construction helped them meet their project deadlines.

Without the DIRTT solution, we wouldn’t have been able to meet our project deadline.

Carrie Nett

Vice President, Facilities, Bell Bank

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

Contact form

Ready to get started?

Connect with a DIRTT construction specialist to bring your next project to life.

© DIRTT 2024