Newsletter Sign Up

    Mariner Holdings

    Art meets function for future flexibility

    • Location

      Overland Park, Kansas

    • SQ FT

      60,000

    • DIRTT Construction Partner

      built

    • Architect

      Hoefer Wysocki Architecture

    • Designer

      Damon Scruggs, Art Wall Designer

    • General Contractor

      Titan Built

    Image Credit: Bob Greenspan Photography

    When you're one of the nation's top, independent financial advisory firms, you see things before others. That same foresight went into Mariner Holdings' new headquarters. They examined every way they could create the perfect space. Ways to draw the best talent and respond to future technology. Tired of tearing down walls as their company evolved, they wanted a solution with future flexibility.

    Product Spotlight

    Scroll horizontally to move
    the image

    Project Includes:

    With the future in mind, Mariner Holdings used Passive Optical Network (PON) throughout their space for unlimited bandwidth. PON also installed in a fraction of the time of conventional copper networks.

    Corning® Willow® Glass back splashes provide sophistication in the coffee bar. Willow Glass was also the ultimate tool to express their culture. They held a contest among employees to design a creative artwork for the massive feature wall. The winning design was an interpretation of the Mariner logo. DIRTT painted the artwork onto micro-thin Willow Glass and applied it to DIRTT wall panels. It was installed on the 40-foot-long by 14-foot-high wall with the exacting precision demanded by an artwork.

    Learn more about the Mariner project here.

    Every time I came in to see the DIRTT being installed, I was like a kid in a candy store.

    Kara Stoecklein

    Senior VP of Human Resources, Mariner Holdings

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    Contact form

    Ready to get started?

    Connect with a DIRTT construction specialist to bring your next project to life.

    Privacy Policy

    Intellectual Property

    Terms & Conditions

    © DIRTT 2023