- LocationLas Vegas, Nevada
- Year2018
- Sq Ft2500
- Architect10Nine Design
- General ContractorSR Construction
- DesignerDesign Studio Blue
Healthcare meets flexibility and innovation
When this advanced medical center was due for a renovation, they turned to DIRTT to deliver on their tight timeline. Embracing a new approach to construction, meant they could make last-minute changes to their design without impacting the timeline. Once manufactured, the space was installed on-site in just three short weeks.
The facility had originally budgeted for 16 headwall units. But using DIRTT Flex Gas instead of copper to build them out saved them money. They funneled the funds back into their project and with that money, built two more headwall units. They clad the entire space with DIRTT curtain walls and added graphic Willow Glass tiles. They also added millwork to the project's scope. The 3D laminate finishes add durability to the entire space and increased infection prevention and control.
Installation wasn’t the only speedy element to the project. It also received state health approval in record time. On the same day.
Related Projects
Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.
Get In Touch