- LocationSalt Lake City, Utah
- Year2017
-
Installation Duration4weeks
- DIRTT PartnerHB Build
- General ContractorLayton Construction - ICS Group
- DesignerHUB Studio
One interior, two different buildings
Instructure was in a unique position. They needed a temporary space until their permanent office was complete. But this pop-up office couldn’t be typical. They needed a vibrant environment that would inspire employees. DIRTT’s modular approach offered a sustainable solution that allowed them to build now, relocate in the future and make the most of their investment.
DIRTT’s design integration platform ICE® gave Instructure the ability to experience their space in advance. And the technology-backed approach delivered a high-quality aesthetic. One year after their temporary space came to life, their full DIRTT interior seamlessly transitioned to their permanent office across the parking lot. This eliminated a significant amount of waste and time. As a busy software company, they wanted as little downtime as possible for their team. With DIRTT the install only took four weeks. Now they have a space employees are proud of. They love bringing clients and family members to tour their workspace. And they use it as a recruiting tool, too.
Employees love this space. With DIRTT we are able to integrate technology and give them all the whiteboard space that they want.
Evelyn Guerra, Director of Administration at Instructure
Related Projects
Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.
Get In Touch