Join our Email List

pb2 architecture + engineering

Fast form and functionality.

  • Location

    Rogers, Arkansas

  • SQ FT

    25,944

  • DIRTT INSTALL

    5 weeks

  • DIRTT Construction Partner

    Evo

  • Architect

    pb2 architecture + engineering

  • Designer

    pb2 architecture + engineering

  • General Contractor

    Clark Contractors

Image Credit: KES Photo

Even though they had outgrown their office and time was running out on their lease, pb2 architecture + engineering wasn’t ready to compromise. They wanted a beautiful innovative space to attract and retain their growing team. A space to showcase the work they do for clients every day. To bring that vision to reality, pb2 turned to DIRTT.

Product Spotlight

Scroll horizontally to move
the image

As a modular, multi-trade, prefab construction system, DIRTT can streamline schedules with reduced lead times and quick installation. Precision manufacturing not only ensures exceptional fit and finish, it also allows interior elements to be built while the building is being prepared on-site. Streamlining the construction process allowed pb2 time to ask, “what if?” They were able to finesse their color palate, incorporate warm veneers, and create custom work surfaces for their private offices. It was an extension of their design timeline that wouldn’t have been possible with a completely conventional build. This was key, as a month-to-month lease ticked away at their previous location. In the end, pb2 got a space that impressed employees as much as visiting clients and potential hires. A blend of innovation, functionality, and seamless efficiency.

Project Includes:

IMAGE CREDIT: KES Photo

“Working with DIRTT and EVO allowed us to get design concept enough nailed down to where we could get in for permits while we really kind of played with the design of the DIRTT pieces for quite a while. That allowed us to extend the design timeline well past what we could have done if we were doing this all conventionally built.”

Scott Broadbent

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

© DIRTT 2025