Academic Medical Center
Using prefabricated construction to get ahead of schedule
Location
DIRTT INSTALL
DIRTT Construction Partner
Architect
General Contractor
When COVID-19 hit, everything changed. To prepare for an influx of patients, healthcare organizations needed to increase the number of people they could treat. This particular facility was already under construction when North America started locking down. To speed up construction under tighter restrictions, they turned to DIRTT. They knew that our advanced manufacturing and modular approach could shave valuable time off their schedule.
Product Spotlight
Project Includes:
They asked DIRTT to build 16 patient headwalls. As those in healthcare know, this isn’t a matter of throwing up a few panels and calling it a day. Headwalls have specific code requirements related to power and medical gasses on the inside. The project had allotted four weeks for preconstruction. DIRTT cut that time in half, then installed the headwalls in just five days. It’s something that would be impossible with conventional construction. From first phone call to the end of install was only seven weeks total. Instead of focusing on punch lists they were focusing on patients by opening sooner.
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.