Solid Walls

Integrations

Additional Projects

Share this

Pilot Inc.

It really ties the room together

  • Location

    Boston, Massachusetts

  • SQ FT

    6,300

  • DIRTT INSTALL

    5 Days

  • DIRTT Construction Partner

    Creative Office Resources

  • Architect

    Hudson Design Group

  • General Contractor

    Lortie & Sons Construction

DIRTT interiors

Image Credit: Nik Weikert/Pilot Studio

One of the things the team at Pilot Inc. loved about their offices was the exposed southern yellow pine ceiling. When they were retrofitting, they wanted a way to amplify the warmth of the existing ceiling by bringing those tones further into the space. It had to be cohesive and continuous. That’s when they decided on DIRTT timber frame.

Product Spotlight

Combination Walls

Combination Walls

Modular Wall System

Combine solid and glass walls for the best of both worlds.

Technology

Technology

Integrate Devices with Your Walls

Use DIRTT walls to house and protect powerful technology.

Timber

Timber

A striking design and structural element

Use the warmth of wood to enhance your space.

Scroll horizontally to move
the image

Spotlight
Spotlight

Writable Surfaces

Finishes for Added Functionality

Use your walls to create, collaborate, and communicate.

Project Includes:

    Inspired to create a meeting area using timber, glass, and integrated technology they had a specific vision for the design. As a branding agency, Pilot has unparalleled attention to detail and a desire for every element to be perfect. Working with DIRTT they custom matched a timber stain to the existing wood to create a bright and striking meeting space that looked exactly how they imagined. Now, when clients visit, they’re floored by the timber structure. They can’t believe it wasn’t part of the space to begin with. Seamless integration brings the design life.

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    Privacy Policy

    Intellectual Property

    Terms + Conditions

    Investor Presentations

    © DIRTT 2026