Douglas College Student Centre

Sustainable construction that enables students and engages employees

  • Location

    New Westminster, British Columbia

  • SQ FT

    29,127

  • DIRTT INSTALL

    2 months

  • Architect

    HCMA Architecture and Design

  • General Contractor

    Turner Construction Company

Image Credit: Upper Left Photography

As the largest degree-granting college in British Columbia, Douglas College prides itself on creating learning environments that are responsive and forward-looking. They wanted a sustainable way to combine multiple service areas in one space. And they needed to do it quickly. They planned to open in June of 2020, less than a year after the project began.

The DIRTT system allowed them to achieve their ambitious timeline. Using DIRTT as a framework for construction offered efficiencies throughout the project, from design integration and lead times to on-site installation. Our clean approach to construction reduced on-site waste and our eye on sustainability allowed Douglas College to divert considerable waste from the landfill.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

Thanks to extensive consultation during design, the new student-centered space delivered on functionality too. Writable surfaces made meetings more effective. Acoustic performance supported the counseling and testing resources the College provided. Casework lockers offered students valuable storage space. And a Leaf Folding Wall® with a door added flexibility to meeting areas that needed adjustable capacity for after-hours meetings and future student spaces. The result was a welcoming space for students that also provided functionality and operational efficiencies for employees.

The renovated space is wonderful to be in with lots of natural light and a clean contemporary feel for the employees that work there. The open area in front of Enrolment Services is accessible and welcoming and has become a student favorite.

Chris Gardner

Director, Facilities and Ancillary Services, Douglas College

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.