Greater Atlanta Christian School

From old school to new school in just three months

  • Location

    Norcross, Georgia

  • SQ FT

    70,000

  • DIRTT INSTALL

    3 months

  • DIRTT Construction Partner

    Corporate Environments

  • Architect

    Kohl Gramigna & Associates Architects

  • General Contractor

    Choate Construction

DIRTT interiors

Image Credit: 2020 Services

Greater Atlanta Christian School was looking at 70,000 square feet of cinder block walls and aging classrooms that they wanted to turn into a 21st century learning studio. Serving grades seven to 12 meant serving a variety of students. Just as important, they wanted to renovate the school without disrupting classes. Renovation would start in late May and be complete before students returned in the first week of August.

Product Spotlight

Scroll horizontally to move
the image

Spotlight

Project Includes

    The general contractor was initially skeptical that the space would be done on time. But DIRTT’s assemblies are precision manufactured in our factories to arrive on-site for a quick install. Using rich veneer, writable surfaces, and integrated displays transformed industrial looking classrooms into a welcoming and collaborative space. Student and parents were blown away when they went back to school. And at $100/square foot, Greater Atlanta wasn’t just on time, it was on budget too.

    CASE STUDY

    When our students and their parents and our faculty came back after that summer, they were blown away with what they saw. The space is radically transformed.

    Scott Harsh

    President, Greater Atlanta Christian School

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.