Don Ross Middle School
21st century learning solutions
Location
SQ FT
DIRTT INSTALL
Architect
Don Ross Middle School wanted to update the learning experience for their students. But engaging the student body wasn’t going to be straightforward. They had a 70-year-old building that hadn’t been refreshed in decades. Building remediation was going to eat into the time they had for construction. The clock was ticking. The deadline was September. How could they create an active learning environment in less than five months? As far as the architect was concerned, DIRTT was the only way to do it.
Product Spotlight
Project Includes:
Making the most of off-site construction, the DIRTT factory built a state-of-the-art learning commons while other teams worked to update the base building. Because both of these things were happening at the same, the school got a compressed schedule without compromise. Bright rooms, writable surfaces, usable spaces. And durable ones too. Because let’s be real — middle school students aren’t known for being gentle on their surroundings. Now this modern learning center gives them a place to break out, hang out and collaborate.
It’s the show piece of the school district.
Ian Currie
Director of Operations, School District No.48
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.
Ready to get started?
Connect with a DIRTT construction specialist to bring your next project to life.