Additional Projects

Share this

Oregon State University – Dixon Recreation Center

Making a big impact with a small student space.

  • Location

    Corvalis, Oregon

  • SQ FT

    6,142

  • DIRTT INSTALL

    11 days

  • DIRTT Construction Partner

    Eteriors

  • Architect

    Woofter Bolch Architecture

  • Designer

    Nossa Norman Design

DIRTT interiors

Image Credit: Stephen A. Miller

Updating the Dixon Recreation Center at Oregon State University (OSU) was all about balance. How to get a big impact with a small footprint. How to create a sense of connection while still maintaining privacy. How to serve students today with a space that can adapt over time. To help OSU achieve this, the architect recommended DIRTT.

Product Spotlight

Scroll horizontally to move
the image

Spotlight

Project Includes:

    DIRTT glass walls frame offices and meeting rooms, maintaining visual connection and allowing the transmission of light. Glass sliding doors maximize the usable space and robust acoustic gaskets provide the necessary speech privacy. Custom color matching celebrates school spirit with OSU’s signature orange on wall panels and powder coated aluminum extrusions. And while these spaces have a huge impact on the way students use the building today, OSU knows the education landscape is prone to change. DIRTT’s layered modularity means if they need to convert to an open environment to serve their students, then this space is ready to easily adapt.

    Whenever we're in a situation where we're adding small office spaces, we're always interested in looking at the DIRTT system for the sliding doors because, acoustically, we know they work.

    Miles Woofter

    Principal, Woofter Bolch Architecture

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    © DIRTT 2026