Additional Projects

Share this

Fraser Health Authority — Eagle Ridge Hospital

Building capacity and peace of mind

  • Location

    Port Moody, British Columbia

  • SQ FT

    91,900

  • DIRTT INSTALL

    2 months

  • Designer

    Kasian Architecture

  • General Contractor

    Halse Martin

This open hospital area has various exam spaces with DIRTT headwalls and nurse stations.

Image Credit: Demin Photography

Part of the Fraser Heath Authority, Eagle Ridge is a community hospital offering immediate service in their emergency room and future support through rehabilitation. Their approach to renovation and expansion was similar – update the facility today with an eye to evolving the space in the years to come. They needed more than just medical grade finishes to support infection prevention and control. They had a plan to use an adaptable construction system to reduce operational expenses.

Product Spotlight

Scroll horizontally to move
the image

Spotlight

Project Includes:

    Using modular solutions to offer easy access to the wall cavity gave Eagle Ridge an opportunity to save time and money on maintenance and technology upgrades. DIRTT wall assemblies with easy-to-remove panels let the hospital update room in just hours rather than days. Without the dust that comes with drywall renovation, they can make those changes without shutting down the entire department. While durable custom graphic panels improve the patient experience, the reduced operational downtime for this health system translates to increased revenue generation.

    I love coming to work in this space. It's not like any other place in the hospital. People actually feel uplifted when they come in for treatment which makes my job easier.

    Eagle Ridge Hospital nurse

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    © DIRTT 2026