Powers of Arkansas

Making a statement. Making change easy.

  • Location

    Springdale, Arkansas

  • SQ FT

    14,000

  • DIRTT INSTALL

    18 days

  • DIRTT Construction Partner

    EVO

  • Architect

    WER Architects

  • Designer

    WER Architects / EVO

  • General Contractor

    CR Crawford

Image Credit: KES Photo

Back in 2022, Powers of Arkansas used DIRTT to build out their Building Automation and Controls department offices in Little Rock. They converted warehouse space into offices using our prefabricated, modular construction system shaved weeks off their construction schedule. Two years later, when this HVAC company commissioned a new building in Springdale for their growing sales and support team, they wanted the same kind of speed. With industry-best lead times and quick installation, DIRTT was able to get them in eight weeks faster than conventional construction. But Day One was only the beginning.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

Once the Powers team was in, they were able to make a statement with their cutting-edge space. Glass walls provided natural light, solid walls offered a durable finish, and the wall assemblies protected embedded technology. With televisions behind writable glass, conference rooms become even more efficient. Sharing digital floorplans on a display, collaborators could draw right on the glass to get everyone on the same page quickly.

Over time, the building continued to evolve with them. A few weeks in, team members realized there were small adjustments to the space that could make their day to day easier. Since DIRTT is designed for disassembly and reconfiguration, walls and doors could be reconfigured in less than a day without downtime or drywall dust. And that, as owner Alan Hope says, “really makes the team happy.”

IMAGE CREDIT: KES Photo

The less drywall you have, the quicker it goes for the DIRTT system. So, that's why we started just from day one designing around DIRTT because we knew it would cut off six to eight weeks of time. And time is money. We wanted to get in there as quickly as we could.

Alan Hope

Owner, Powers of Arkansas

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.