Your current browser is not supported. We built DIRTT.com with the latest technology to bring you a better experience. To view DIRTT.com, we recommend using the latest version of Chrome, Safari or Firefox. 

DIRTT
  • Location
    Las Vegas, Nevada
  • Year
    2020
  • Installation Duration
    6
    weeks
  • Sq Ft
    71000
  • DIRTT Partner
    HB Build
  • Architect
    H+K Architects

Durable, adaptable, and sustainable

It’s important to be ready for anything. Just ask the Nevada Army National Guard. As they set out to build their new readiness center, they wanted versatility. This space would be helping locals with pandemic preparedness at the same time it coordinated logistics or remote islands in the Pacific. And they do that knowing that at any moment the building could become an emergency operation center. They needed meeting spaces, offices, classrooms, and assembly halls to serve the people that were serving Nevada.

Building with DIRTT ensured that this space would deliver exactly what this high-performance organization needed. Using durable thermofoil wall panels ensures the longevity of the space. Behind those walls is recycled denim insulation. As a bio-based material it contributed to the building’s Leed Silver project certification. It also improved acoustical performance – critical for a military facility where confidential conversations require privacy. DIRTT systems are manufactured off-site for a precise fit and an easy installation. The precision of our construction process ensures unparalleled fit and finish. And modular components allow for easy reconfiguration as the needs of the space change. So even while the team was thrilled with look of their new space, they also knew it could adapt for them if it was required in the future. Like we said, it’s important to be ready for anything.

 

  • Take A Tour

    Photo Credit: Nicholas Swann
    Versatile space
  • Photo Credit: Nicholas Swann
    Meeting room
  • Photo Credit: Nicholas Swann
    Commander's office
  • Office space
    Photo Credit: Nicholas Swann
14
Details

Better sound privacy

DIRTT takes a holistic approach to sound management. This means we can meet the acoustic requirements and speech privacy needs of any space.

Details

Efficient electrical

DIRTT’s quick-connect power makes for rapid on-site installation. All while it reduces waste and improves adaptability for any future changes. 

Details

Latest tech in the walls

Cleanly integrate any type of technology and keep it secure. Maximize function and looks while you save space.

Details

Do more with your walls

WriteAway™ film combines a dry-erase marker board with your walls for an integrated and more elegant solution. Add graphics or inspire collaboration without unsightly ghosting.

Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.

Get In Touch

Close