Redefining modular construction standards for Jefferson Health

DIRTT’s scalability and precision manufacturing elevate the patient experience and reduce maintenance costs at the Honickman Center.

Share this

The Honickman Center is a 19-story building in Philadelphia’s East Market. Jefferson Health took full advantage of DIRTT’s scalability to consolidate 12 clinics under one roof with speed and cost certainty.

  • Location

    PHILADELPHIA, PENNSYLVANIA

  • SQ FT

    462,000

  • DIRTT Construction Partner

    FORBUILD

  • Architect

    STANTEC

  • Designer

    STANTEC

  • General Contractor

    LF DRISCOLL CO.

The Challenge

The Honickman Center is home to a dozen programs—everything from cancer support and respiratory care to gastroenterology. Each specialty’s unique needs had to be accommodated. Plus, Jefferson Health required speed, cost certainty, and a future-ready interior that would minimize operational expenses. The flexibility of the DIRTT Construction System was ideal in designing spaces to work for patients and practitioners.

Gallery image
© Jeffrey Totaro, 2024

Our Solution

DIRTT’s suite of modular components work together seamlessly. They’re designed to integrate in a variety of configurations to easily accommodate the specific needs of different clinics. The high-end fit and finish of our healthcare-specific components, casework, walls, and doors is unmatched.

Our modular, prefabricated components are designed for disassembly and reconfiguration. This makes DIRTT systems ideal to accommodate maintenance needs, technology upgrades, and renovations. Updates can be made with minimal cost, dust, and downtime.

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4

The Impact

Visitors to the Honickman Center are struck by the elegant design, large-scale biophilic graphics, and elevated patient experience. However, one of the project’s most remarkable outcomes isn’t even visible. When Jefferson Health looked at maintenance orders across their organization, they discovered that DIRTT could deliver operational savings of between 30% and 70%. It’s a win-win that proves controlling costs doesn’t have to come at the expense of patient care.

Project Includes:

    Related Projects

    EvergreenHealth Critical Care Unit

    EvergreenHealth Critical Care Unit

    Building a better hospital.

    View project
    This open hospital area has various exam spaces with DIRTT headwalls and nurse stations.

    Fraser Health Authority — Eagle Ridge Hospital

    Building capacity and peace of mind.

    View project
    University Medical Center

    University Medical Center

    Fit, finish and faster schedule.

    View project
    New York Medical Center

    New York Medical Center

    Aging building gets a state-of-the-art update.

    View project

    Our Process

    Build with a construction system that gives total design freedom and greater certainty in cost, schedule, and outcomes. Our intelligent framework leverages advanced technology for a simpler experience. Create the space you envisioned faster and cleaner, with exacting precision.

    Privacy Policy

    Intellectual Property

    Terms + Conditions

    Investor Presentations

    © DIRTT 2026