Jungbunzlauer Chicago Connect
An enduring test kitchen for innovative solutions and customer engagement
Location
Rosemont, Illinois
SQ FT
9,000
DIRTT INSTALL
21 days
DIRTT Construction Partner
Continua
Architect
Interwork Architects
Designer
Interwork Architects
General Contractor
Tenant Project Services
Image Credit: View My Space
Jungbunzlauer produces biodegradable ingredients that contribute to healthier, safer, and tastier products. If you’ve ever enjoyed yogurt or used hand lotion, chances are you’ve experienced the benefits from their test kitchen. After five years at their Chicago-based Application Technology Center, Jungbunzlauer outgrew their original space and needed to relocate. They had built part of their original space with DIRTT, and the sleek, durable wall panels were their favorite part of the old office. When it came time to move, they decided to build as much of the new application technology center as possible with DIRTT. And they even took as much of the existing DIRTT casework as possible to be reused in their new space.
Product Spotlight
Scroll horizontally to move
the image
Project Includes:
The choice was driven mainly by aesthetics. DIRTT allowed them to wow guests who visited their state-of-the-art test kitchen. But during construction, Jungbunzlauer learned how DIRTT can reduce construction schedules too. When site delays pushed out the start date of the project, the clock was ticking on Jungbunzlauer’s existing lease. Once they got approvals, speed was crucial. While contractors prepped the building, DIRTT was custom manufacturing elements of their space in our factory. In less than a month, the modular wall assemblies were on-site. Just three weeks later they were installed. From project approval to occupancy, the entire process took just two months, allowing Jungbunzlauer to return to their test kitchen and continue their mission of making the world a safer, healthier, and tastier place.
91% of the casework on this project was reused.
Custom integrations support life science spaces
IMAGE CREDIT: View My Space
When we decided to move our office and double its size, it was almost an easy decision. I said, let's just do the whole thing with DIRTT.
Dan Rainville
President and General Manager, Jungbunzlauer Inc.
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.
Ready to get started?
Connect with a DIRTT construction specialist to bring your next project to life.