Additional Projects

Share this

Jungbunzlauer Chicago Connect

An enduring test kitchen for innovative solutions and customer engagement

  • Location

    Rosemont, Illinois

  • SQ FT

    9,000

  • DIRTT INSTALL

    21 days

  • DIRTT Construction Partner

    Continua

  • Architect

    Interwork Architects

  • Designer

    Interwork Architects

  • General Contractor

    Tenant Project Services

DIRTT interiors

Image Credit: View My Space

Jungbunzlauer produces biodegradable ingredients that contribute to healthier, safer, and tastier products. If you’ve ever enjoyed yogurt or used hand lotion, chances are you’ve experienced the benefits from their test kitchen. After five years at their Chicago-based Application Technology Center, Jungbunzlauer outgrew their original space and needed to relocate. They had built part of their original space with DIRTT, and the sleek, durable wall panels were their favorite part of the old office. When it came time to move, they decided to build as much of the new application technology center as possible with DIRTT. And they even took as much of the existing DIRTT casework as possible to be reused in their new space.

Product Spotlight

Scroll horizontally to move
the image

Spotlight

Project Includes:

    The choice was driven mainly by aesthetics. DIRTT allowed them to wow guests who visited their state-of-the-art test kitchen. But during construction, Jungbunzlauer learned how DIRTT can reduce construction schedules too. When site delays pushed out the start date of the project, the clock was ticking on Jungbunzlauer’s existing lease. Once they got approvals, speed was crucial. While contractors prepped the building, DIRTT was custom manufacturing elements of their space in our factory. In less than a month, the modular wall assemblies were on-site. Just three weeks later they were installed. From project approval to occupancy, the entire process took just two months, allowing Jungbunzlauer to return to their test kitchen and continue their mission of making the world a safer, healthier, and tastier place.

    DIRTT

    91% of the casework on this project was reused.

    DIRTT
    DIRTT
    DIRTT

    Custom integrations support life science spaces

    DIRTT
    DIRTT
    DIRTT

    IMAGE CREDIT: View My Space

    When we decided to move our office and double its size, it was almost an easy decision. I said, let's just do the whole thing with DIRTT.

    Dan Rainville

    President and General Manager, Jungbunzlauer Inc.

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    © DIRTT 2026