Solid Walls

Integrations

Additional Projects

Share this

Northland Power

Making a statement with adaptive reuse

  • Location

    Toronto, Ontario

  • SQ FT

    33,000

  • DIRTT Construction Partner

    POI

  • Architect

    Bullock + Wood Design

  • Designer

    Bullock + Wood Design

  • General Contractor

    Vestacon

DIRTT interiors

Image Credit: Joaquim Santos

Northland Power headquarters was happily growing in the Yonge-St. Clair Neighborhood in Toronto, but this sustainable energy provider needed more space to support their team. Instead of relocating offices, an opportunity arose to take over three new floors in their existing building. That meant they could stay close to home and keep the move simple. Working in their favor, those existing floors were built with DIRTT offering an optimal baseline layout and flexibility.

Product Spotlight

4” Solid Walls

4” Solid Walls

Modular Panel Wall System

Customize your walls and define your space.

Classic Glass Walls

Classic Glass Walls

Modular Glass Wall System

A clear choice for speed, precision, and performance.

Sliding Doors

Sliding Doors

Top-Mounted Sliding Barn Doors

Maximize your square footage and customize with confidence.

Electrical

Electrical

Modular Electrical System

A powerful approach to connected infrastructure

Technology

Technology

Integrate Devices with Your Walls

Use DIRTT walls to house and protect powerful technology.

Scroll horizontally to move
the image

Spotlight
Spotlight

Graphics

Applied Finishes Support Your Aesthetic

Tell the story of your space with custom graphic wall panels.

Project Includes:

    The DIRTT Construction System is modular, allowing Northland to make an array of changes to their new office with less cost and less disruption. In spaces where the layout suited them, wall panels could be easily replaced to refresh the aesthetic. In areas where the floorplan needed an update, walls were disassembled, reconfigured, and reassembled quickly and easily. Without the dust that comes with ripping out drywall, Northlanders could work in the space while renovations were being completed. Even the team members with allergies weren’t disrupted. Repurposing the interiors aligned perfectly with Northland’s brand and focus on green infrastructure. In the end, the project was completed on time and on budget while reusing 75% of the existing DIRTT.

    Learn more about this project on our Insights Page.

    MICROTOUR

    DIRTT is amazing, right? If you want minimal dust, faster construction timeline, it’s cost effective, and if you have the vision of changing your space in the next few years, I think go with DIRTT.

    Gemma Marquez

    global corporate services manager, Northland Power

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    Privacy Policy

    Intellectual Property

    Terms + Conditions

    Investor Presentations

    © DIRTT 2026