Solid Walls

Integrations

Additional Projects

Share this

Edgeworth Economics

Flexibility to take on the future

  • Location

    Washington D.C.

  • SQ FT

    10000

  • DIRTT Construction Partner

    Intellistruct / Bialek

  • Architect

    OTJ Architects

  • General Contractor

    HITT Contracting

DIRTT interiors

Image Credit: ©Judy Davis / Hoachlander Davis Photography

This consulting firm needed a cutting-edge space today and for years to come. Maximizing flexibility was essential as they looked to the future. This was especially critical when it came to their technology. DIRTT’s future-proof approach to construction was the perfect match.

Product Spotlight

4” Solid Walls

4” Solid Walls

Modular Panel Wall System

Customize your walls and define your space.

Classic Glass Walls

Classic Glass Walls

Modular Glass Wall System

A clear choice for speed, precision, and performance.

Sliding Doors

Sliding Doors

Top-Mounted Sliding Barn Doors

Maximize your square footage and customize with confidence.

Electrical

Electrical

Modular Electrical System

A powerful approach to connected infrastructure

Technology

Technology

Integrate Devices with Your Walls

Use DIRTT walls to house and protect powerful technology.

Fixed-Height Access Flooring

Fixed-Height Access Flooring

Low-Profile, Fixed-Height Access Flooring

A solid foundation for connected infrastructure with quick access

Scroll horizontally to move
the image

Spotlight
Spotlight

Writable Surfaces

Finishes for Added Functionality

Use your walls to create, collaborate, and communicate.

Project Includes:

    A 7,900 square foot DIRTT access floor with quick-connect electrical gives them an adaptable floor plan. Future outlet reconfigurations will be simple and cost effective. Integrated technology can be changed out for newer models in minutes by popping out a DIRTT panel. Room sizes can be adjusted thanks to the DIRTT construction system.

    Collaboration areas with writable surfaces allow big ideas to flourish. And thanks to DIRTT’s acoustical management, sound privacy isn’t a concern. Breathe walls top off the space, creating a comfortable atmosphere for employees and clients alike

      01

      PLAN

      Discover how DIRTT can bring the most value to your project.

      02

      TRANSLATE

      Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

      03

      MANUFACTURE

      With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

      04

      INSTALL

      DIRTT components are rapidly installed on a clean job site with less waste.

      05

      ADAPT

      Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.

    Privacy Policy

    Intellectual Property

    Terms + Conditions

    Investor Presentations

    © DIRTT 2026