Your current browser is not supported. We built DIRTT.com with the latest technology to bring you a better experience. To view DIRTT.com, we recommend using the latest version of Chrome, Safari or Firefox. 

DIRTT
  • Location
    Kansas City, Missouri
  • Year
    2015
  • Installation Duration
    4
    weeks
  • Sq Ft
    18000

The power to learn

Avila University needed to update their library space. Not surprising since it was originally built in the 1970s. Their team wanted to create an environment that would encourage their students to not only to achieve, but to excel. To do that, the inside had to be completely refreshed in a way that supported active learning. This meant small group spaces, writable surfaces and integrated technology. It meant DIRTT.

To leverage the full capability of the space, Avila installed an access floor and used DIRTT quick connect power solutions. Wiring the rooms with technology built into the walls was simple. It took four technicians only four days to pull all the cable for the space. Using conventional power would have taken five times as long.

Now they have a connected classroom to prepare students for the real world. There’s an innovative learning center with four embedded monitors for both students and faculty. Not to mention small group study rooms for up to eight people. And because DIRTT is designed for disassembly, it’s all flexible for the future. The donors loved that their contribution was going to help students for years to come. Avila University wanted a space that was totally different from what they had before. And DIRTT could do it, because we offer a different way to build.

 

It’s a tremendous asset for the university and it says this is a space that is dedicated to your success as a student.

Ronald Slepitza, President Avila University
  • Take A Tour

    Small group spaces
  • Active learning
  • Integrated technology
  • A space for everyone
15
Details

More under foot

The DIRTT Access Floor speeds up installation and manages cables. Long term, it keeps your infrastructure easily accessible for IT.

Details

Design freedom and certainty

DIRTT Millwork gives you complete design freedom without paying for the cost of custom. All on fast and certain DIRTT lead times.

Details

Efficient electrical

DIRTT’s plug-and-play power makes for rapid on-site installation. All while it reduces waste and improves adaptability for any future changes.

Details

Latest tech in the walls

Cleanly integrate any type of technology and keep it secure. Maximize function and looks while you save space.

Details

Do more with your walls

WriteAway™ film combines a dry-erase marker board with your walls for an integrated and more elegant solution. Add graphics or inspire collaboration without unsightly ghosting.

Ready to start your project? Join thousands of happy clients who love their space. Need more time? Sign up below to get news and updates until you’re ready for a better way to build.

Get In Touch

Close